Quantcast
Channel: SCN : All Content - PowerBuilder Developer Center
Viewing all articles
Browse latest Browse all 2935

PB objects not sync'ing to TFS after forced get

$
0
0

All - Wierd problem. In spite of doing multiple force "get specific" from TFS, at directory level and object level, objects in pbl's are still showing up with the "+" sign next to them, demanding to be added to source control, instead of the little round dot that shows TFS and PB objects are in sync. Never have had this stick like this before. Details:

 

- workspace is connected properly to TFS

- no objects are checked out

- "get latest" tells me all objects are current

 

When I tried doing an "add to source control" to go backwards into TFS, it continually creates a new directory tree containing a new instance of the object/s I added (makes sense, as you don't want to step on an existing instance in TFS, but doesn't help...). Has anyone ever run into this and come up with a solution to get PB recognizing TFS and vice versa? Thanks.

jt


Viewing all articles
Browse latest Browse all 2935

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>